Veloci · June 2026 Roadmap

Four-week creative plan · prepared by AND Studio · for Tyler + team review

This is the operating plan for June. Hard-launch month. The macros below are the cohorts the brand earned its first traction with. The work is to widen the M2 Hoka Migration wedge while M1 Performance Runner holds the efficient baseline and M3 Creator-Diversity tests the next lane.

Note on entering June. Daily Meta spend trending $3.5K (down from $4.4K early May). Blended CPA ~$98, targeting $70. Inventory tight until end-September. June production is built to widen the buyable surface while holding to that inventory window.

01

North Star

Performance running with a distinct silhouette. Founder-runner credibility, not corporate athletic.

The moat is authenticity plus visual distinctiveness. Tyler is the runner on screen; the silhouette does not look like Hoka, Nike, or Adidas. The creative carries both. June leans into the migration argument: there is a Hoka rider who has not found their next shoe yet, and the brand earns the next-shoe slot through founder credibility and silhouette difference.

Founder voice anchors the M2 hero. Tyler on-camera in lived running context, not styled studio. The credibility argument compounds across cohorts.

02

Macro Structure

Three macros run in June. Spend allocation calibrated to where the account has converted to date.

M1 · Performance Runner (Maintenance · 25-30% spend)

The runner cohort already converted on performance credibility. Holds the efficient spend. June refreshes hooks within this lane rather than expanding it.

M2 · Hoka Migration (HERO · 45-50% spend)

The hero macro. The Hoka rider looking for the next thing. Founder-on-camera concepts, silhouette comparison, distinct-look framing. Where the month is won.

M3 · Creator-Diversity (TEST · 20-25% spend)

Trybe creator slate. Body-type diversity, run-style diversity, geographic diversity. Reads as a TEST macro to find what scales beyond the founder-runner core.

03

Four-Week Posture

30 total assets across the month. Up from a baseline of 20. Cadence below.

Week 1 · Foundation · June 1-7

Week 2 · Push · June 8-14

Week 3 · Scale · June 15-21

Week 4 · Close · June 22-28

04

Week 1 Preview

The named concepts shipping by Saturday June 7.

M1 · Performance Runner

M2 · Hoka Migration

M3 · Creator-Diversity

Day-3 signal check: thumbstop rate and 3-second view-through against May baseline. Day-7 read: spend allocation reweighted; M3 reread for whether creator slate earns its 20-25% or drops.

05

Key Data Points

Where we start

How we’ll know it’s working

06

What We Need From You

This week

Next week

Standing

Sign-off · one-click approval

Reply to this doc with "Approved" to lock the month. Revisions handled within 24 hours via email, Slack, or reply.

Primary contact: John Ty · john@andstudio.nyc · creative lead

Founder relationship: Robbie Hampton · robbie@andstudio.nyc